WEBVTT

00:07.440 --> 00:11.350
Hello everyone, myself Baradwas.

00:11.350 --> 00:11.360



00:11.360 --> 00:15.509
In this video I will show you some 4 to

00:15.509 --> 00:15.519



00:15.519 --> 00:18.870
20 milliamp based instruments. If you

00:18.870 --> 00:18.880



00:18.880 --> 00:23.910
see here this is a level transmitter.

00:23.910 --> 00:23.920



00:23.920 --> 00:27.910
This instrument measures this tank level

00:27.910 --> 00:27.920



00:27.920 --> 00:31.109
and generates an equivalent 4 to 20

00:31.109 --> 00:31.119



00:31.119 --> 00:34.229
milliamps signal

00:34.229 --> 00:34.239



00:34.239 --> 00:38.150
and then it sends this signal to the DCS

00:38.150 --> 00:38.160



00:38.160 --> 00:40.389
system.

00:40.389 --> 00:40.399



00:40.399 --> 00:43.270
I will show you one more instrument. It

00:43.270 --> 00:43.280



00:43.280 --> 00:49.190
is control wallve. Our DCS system sends

00:49.190 --> 00:49.200



00:49.200 --> 00:52.470
analog output which is 4 to 20 millia

00:52.470 --> 00:52.480



00:52.480 --> 00:55.910
signal to this control wall.

00:55.910 --> 00:55.920



00:55.920 --> 00:57.830
If you see here, this is the wall

00:57.830 --> 00:57.840



00:57.840 --> 00:59.430
positioner.

00:59.430 --> 00:59.440



00:59.440 --> 01:02.630
This wall positioner receives this 4 to

01:02.630 --> 01:02.640



01:02.640 --> 01:06.789
20 milliamp signal from the DCS system

01:06.789 --> 01:06.799



01:06.799 --> 01:09.670
and then accordingly regulates the

01:09.670 --> 01:09.680



01:09.680 --> 01:14.469
instrument air flow to the actuator.

01:14.469 --> 01:14.479



01:14.479 --> 01:17.670
Based on the instrument airflow the wall

01:17.670 --> 01:17.680



01:17.680 --> 01:22.789
will open or close. Let's say DCS given

01:22.789 --> 01:22.799



01:22.799 --> 01:27.350
50% signal to the wall.

01:27.350 --> 01:27.360



01:27.360 --> 01:30.469
What is the 50%age equivalence of the

01:30.469 --> 01:30.479



01:30.479 --> 01:33.990
current signal? It is 12 miampere

01:33.990 --> 01:34.000



01:34.000 --> 01:37.030
signal.

01:37.030 --> 01:37.040



01:37.040 --> 01:41.270
So when the DCS sends 12 miamp signal to

01:41.270 --> 01:41.280



01:41.280 --> 01:44.230
the wall positioner, it regulates the

01:44.230 --> 01:44.240



01:44.240 --> 01:47.590
instrument airflow such that the wall

01:47.590 --> 01:47.600



01:47.600 --> 01:52.069
will open 50%.

01:52.069 --> 01:52.079



01:52.079 --> 01:55.350
This is analog output. If we are also

01:55.350 --> 01:55.360



01:55.360 --> 02:00.069
using a wall feedback then we will have

02:00.069 --> 02:00.079



02:00.079 --> 02:03.830
one analog input to the DCS system for

02:03.830 --> 02:03.840



02:03.840 --> 02:07.030
measuring the actual

02:07.030 --> 02:07.040



02:07.040 --> 02:10.710
wall feedback.

02:10.710 --> 02:10.720



02:10.720 --> 02:14.710
And in this picture we can see

02:14.710 --> 02:14.720



02:14.720 --> 02:17.510
uh temperature transmitters. See these

02:17.510 --> 02:17.520



02:17.520 --> 02:19.910
two are temperature transmitters. You

02:19.910 --> 02:19.920



02:19.920 --> 02:23.110
can see the tag name on the top. This is

02:23.110 --> 02:23.120



02:23.120 --> 02:26.229
the canop. TT means temperature

02:26.229 --> 02:26.239



02:26.239 --> 02:27.910
transmitter.

02:27.910 --> 02:27.920



02:27.920 --> 02:30.550
This is area code. This is transmitter

02:30.550 --> 02:30.560



02:30.560 --> 02:33.430
number tag name.

02:33.430 --> 02:33.440



02:33.440 --> 02:36.150
And this is the cable coming from the

02:36.150 --> 02:36.160



02:36.160 --> 02:37.670
thermouple.

02:37.670 --> 02:37.680



02:37.680 --> 02:40.470
And this is the cable going to the DCS

02:40.470 --> 02:40.480



02:40.480 --> 02:42.790
system.

02:42.790 --> 02:42.800



02:42.800 --> 02:45.910
And this is one flow transmitter DP type

02:45.910 --> 02:45.920



02:45.920 --> 02:48.390
differential pressure based flow

02:48.390 --> 02:48.400



02:48.400 --> 02:49.910
transmitter.

02:49.910 --> 02:49.920



02:49.920 --> 02:53.990
All these instruments are 4 to 20 millia

02:53.990 --> 02:54.000



02:54.000 --> 02:56.869
based instruments. They support hot

02:56.869 --> 02:56.879



02:56.879 --> 03:00.630
protocol also for the configuration

03:00.630 --> 03:00.640



03:00.640 --> 03:03.350
of these instruments.

03:03.350 --> 03:03.360



03:03.360 --> 03:05.589
But remember

03:05.589 --> 03:05.599



03:05.599 --> 03:09.509
all instruments in the industries

03:09.509 --> 03:09.519



03:09.519 --> 03:12.550
operates on 4 to 20 millia basis

03:12.550 --> 03:12.560



03:12.560 --> 03:15.430
signals.

03:15.430 --> 03:15.440



03:15.440 --> 03:18.790
Every industry wherever you go you will

03:18.790 --> 03:18.800



03:18.800 --> 03:24.550
find 4 to 20 millia based instruments

03:24.550 --> 03:24.560



03:24.560 --> 03:28.949
and these are two wire instruments.

03:28.949 --> 03:28.959



03:28.959 --> 03:31.509
What is two wire

03:31.509 --> 03:31.519



03:31.519 --> 03:34.789
in this single cable? See this is the

03:34.789 --> 03:34.799



03:34.799 --> 03:38.869
single cable blue color cable. See

03:38.869 --> 03:38.879



03:38.879 --> 03:40.789
this is the blue color cable connected

03:40.789 --> 03:40.799



03:40.799 --> 03:42.949
to the transmitter.

03:42.949 --> 03:42.959



03:42.959 --> 03:45.830
This single cable

03:45.830 --> 03:45.840



03:45.840 --> 03:49.990
provides power supply to the transmitter

03:49.990 --> 03:50.000



03:50.000 --> 03:53.509
and then carries this 4 to 20 millia

03:53.509 --> 03:53.519



03:53.519 --> 03:56.949
output to the DCS system using two wire

03:56.949 --> 03:56.959



03:56.959 --> 04:01.270
that means one pair cable.

04:01.270 --> 04:01.280



04:01.280 --> 04:04.390
You can see this is flow transmitter

04:04.390 --> 04:04.400



04:04.400 --> 04:06.470
only one cable is connected blue color

04:06.470 --> 04:06.480



04:06.480 --> 04:11.270
cable. This is a two wire instrument.

04:11.270 --> 04:11.280



04:11.280 --> 04:14.550
That is why it is very advantageous to

04:14.550 --> 04:14.560



04:14.560 --> 04:19.189
the installation cost optimization when

04:19.189 --> 04:19.199



04:19.199 --> 04:21.990
compared to three wire or four-wire

04:21.990 --> 04:22.000



04:22.000 --> 04:23.749
systems.

04:23.749 --> 04:23.759



04:23.759 --> 04:25.749
We have three-wire instruments.

04:25.749 --> 04:25.759



04:25.759 --> 04:30.310
Four-wire instruments also available

04:30.310 --> 04:30.320



04:30.320 --> 04:34.070
but majority the popular one is two wire

04:34.070 --> 04:34.080



04:34.080 --> 04:37.189
instrument. And next one is present

04:37.189 --> 04:37.199



04:37.199 --> 04:39.830
transmitters. Here we have three

04:39.830 --> 04:39.840



04:39.840 --> 04:43.270
pressure transmitters. See

04:43.270 --> 04:43.280



04:43.280 --> 04:46.230
back side we have a pipeline. On the

04:46.230 --> 04:46.240



04:46.240 --> 04:49.590
pipeline we have tapping point. See this

04:49.590 --> 04:49.600



04:49.600 --> 04:52.550
is the pipeline and we are measuring the

04:52.550 --> 04:52.560



04:52.560 --> 04:55.189
pressure inside this pipeline. For that

04:55.189 --> 04:55.199



04:55.199 --> 04:58.310
purpose there is a tapping point and

04:58.310 --> 04:58.320



04:58.320 --> 05:02.550
using impulse lines. Okay. These are the

05:02.550 --> 05:02.560



05:02.560 --> 05:05.350
impulse tubes.

05:05.350 --> 05:05.360



05:05.360 --> 05:07.749
This pressure is connected to the

05:07.749 --> 05:07.759



05:07.759 --> 05:10.390
instrument. Inside there is a pressure

05:10.390 --> 05:10.400



05:10.400 --> 05:11.990
sensor

05:11.990 --> 05:12.000



05:12.000 --> 05:15.430
and it calculates the pressure signal

05:15.430 --> 05:15.440



05:15.440 --> 05:17.749
and then transmitter sends this signal

05:17.749 --> 05:17.759



05:17.759 --> 05:21.430
to the DCS system using 4 to 20 milliamp

05:21.430 --> 05:21.440



05:21.440 --> 05:25.350
basis current signals. See all these

05:25.350 --> 05:25.360



05:25.360 --> 05:28.390
instruments hot protocol supported for

05:28.390 --> 05:28.400



05:28.400 --> 05:30.150
the configuration.

05:30.150 --> 05:30.160



05:30.160 --> 05:33.350
All instruments will be configured

05:33.350 --> 05:33.360



05:33.360 --> 05:37.670
uh using hot communicator as per the

05:37.670 --> 05:37.680



05:37.680 --> 05:41.510
design or as per the data sheet. And

05:41.510 --> 05:41.520



05:41.520 --> 05:44.870
this is a flow transmitter DP type.

05:44.870 --> 05:44.880



05:44.880 --> 05:49.110
If you see all these signals are carried

05:49.110 --> 05:49.120



05:49.120 --> 05:53.029
out using one pair cable.

05:53.029 --> 05:53.039



05:53.039 --> 05:56.150
We will call this cable as branch cable.

05:56.150 --> 05:56.160



05:56.160 --> 05:59.270
These cables will go to one junction box

05:59.270 --> 05:59.280



05:59.280 --> 06:02.070
installed in the field

06:02.070 --> 06:02.080



06:02.080 --> 06:04.309
and from the junction box one more cable

06:04.309 --> 06:04.319



06:04.319 --> 06:07.749
will go to the control room to carry the

06:07.749 --> 06:07.759



06:07.759 --> 06:09.350
signals.

06:09.350 --> 06:09.360



06:09.360 --> 06:11.990
I will show you the junction box also

06:11.990 --> 06:12.000



06:12.000 --> 06:17.479
for the 4 to 20 millia based signals.
